Identification and classification of the key competencies for social project managers in Agadir, Morocco
DOI:
https://doi.org/10.14738/abr.75.6585Keywords:
Project managers’ competencies, Social project, Project manager successAbstract
The question of project manager competencies and especially in social projects is very important to study to minimize the project fail. The researchers’ work shows the relationship that may exist between project manager competencies and project success. It is well understood that technical competencies have a significant effect on project success, but there are also behavioral competencies which are more important. The present study tries to show that combine behavioral (soft) skills and technical (hard) skills are important to be a good social project manager. The purpose of this paper is to show, on the basis of a quantitative study carried out among 120 managers of social projects in cooperatives located in the city of Agadir (Morocco), that project manager competency are categorized in behavioral skills and technical skills. The result of this study shows that the category of behavioral competencies is more important to achieve success. Consequently, the six-first key competencies identified are commitment and trust, discipline, patience, transparency, good communication, good coordination and work involvement.
References
-Abou-hafs, H. (2015). La performance dans le management de projet : contribution à l’étude des facteurs clés de succès du management de projets événementiels dans la ville de Marrakech. Éditions universitaires européennes, OmniScriptum GmbH & Co. KG, ISBN: 978-3-8416-6918-6. Sarrebruck, Allemagne.
-Abou-hafs, H. & Bellihi, H. (2013).The success Factors of Project Management for events, case of the Wedding Project in Marrakech. Journal of Business and Economics « JBE », ISSN 2155-7950, USA.
-Abou-hafs, H., & Fadila, B. (2018). Good Local Governance: The Criteria. Archives of Business Research, 6(7), 78-85.
-Afitep.1991. Le management de projet : Principes et pratiques. Afnor. Gestion.
-Atkinson, R.(1999) «Project management: cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteria», International Journal of Project Management, vol.17, No.6, p.337-342.
-Al-Tmeemy, S M H M., Abdul-rahman, H. and Harun, Z. (2010), ‘Future criteria for success of building projects in Malaysia,’ International Journal of Project Management, 29 (2011), 337–348.
-Baillargeon, J. (2003), L’analyse en composantes principales,’ [Online] Retrieved Feb. 18, 2013 from www.uqtr.ca/cours/srp-6020/acp/acp.pdf.
-Baril R.(2012) « Compétences humaines essentielles au gestionnaire de projet… Un savoir être nécessaire !», La Revue Francophone du Management de Projet-La Cible n°119, p.16-20, Afitep.
-Belassi,W. and Tukel, O.I. (1996), ‘A new framework for determining critical success/failure factors in projects,’ International Journal of Project Management, Vol.14, No.3, 141–151.
-Bellihi, H. et Abou-hafs, H. (2014). La performance dans le management de projets : Contribution à l’étude des facteurs clés de succès, étude exploratoire auprès des projets évènementiels à Marrakech. International Journal of Management and Technologies « IJMAT», V.8, N.1, Tunis.
-Boudès,T., Charue-Duboc, F. & Midler, C.(1997).Formation et apprentissage collectif dans les entreprises : une expérience dans le domaine du management de projet. Gestion -Revue Internationale de Gestion, automne 1997, volume 22, n°3, Montréal.
-Briner, W., Geddes M. et Hastings, C.(1993).Le manager de projet: un leader. Édition Afnor Gestion, 1993.
-Carricano, M. & Poujol, F.(2008).Analyse de données avec SPSS. Collection Synthex, les éditions Pearson.
-Courtot, H. (1997).Les risques liés à la gestion des acteurs d’un projet. IAE de Paris (Université Paris 1 Panthéon - Sorbonne) - GREGOR – 1997.
-Charbaji, S.(2018). ANTECEDENTS AND CONSEQUENCES OF PRESENTEEISM IN THE LEBANESE SMEs. Journal of WEI Business and Economics-August 2018 Volume 7 Number 2 The West East Institute 1.
-Chmielarza W. & Zborowskib M.(2018). Determinants of Using Project Management in the Implementation of Information Systems. Procedia Computer Science 126 (2018) 1224–1236.
-Chow,T. and Cao, D B. (2007), ‘A survey study of critical success factors in agile software projects,’ The Journal of Systems and Software, 81 (2008), 961–971.
-Dziekoński, K.(2017). Project Managers Competencies Model for Construction Industry. in Poland Procedia Engineering 182 ( 2017 ) 174 – 181.
- Francisco de Oliveira G. & Rabechini Jr R. (2019). Stakeholder management influence on trust in a project: A quantitative study International Journal of Project Management 37 (2019) 131–144.
-Garel, G., 2003, « Pour une histoire de la gestion de projet », Gérer et comprendre, 74 (décembre), 77-89.
-Giard, V. et Midler, C.(1996).Management et gestion de projet : bilan et perspectives. in Encyclopédie de gestion, Y. Simon et P. Joffre éditeurs, Economica, 2° édition.
-IPMA, IPMA Competence Baseline, édition trilingue, IPMA (http://www.ipma.org),1999.
-Kerzner, H.(2013).Project Management: A Systems Approach to Planning, Scheduling, and Controlling Ed. 11.John Wiley & Sons.
-Liikamaa, K.(2015). Developing project managers’competencies: A collective view of the most important competencies. Procedia Manufacturing 3 ( 2015 ) 681 – 687.
-Midler, C.(1993). Le responsable projet : portrait d’un rôle d’influence. revue Gestion 2000, No 2 Louvain-la-Neuve. Belgique.
-Minyem HG. (2007), de l’ingénierie d’affaires au management de projet, Eyrolles éditions d’organisation.
-Müller R. &Turner J.R.(2007).The influence of project managers on project success criteria and project success by type of project. European Management Journal 25 (4) (août), 298-309.
-Müller R. & Turner J.R.(2009).Leadership competency profiles of successful project managers. International Journal of Project Management, 28 (2010), 437–448.
-Müller, R., Turner, R.(2010). Leadership competency profiles of successful project managers. International Journal of Project Management 28 (4), 437–448.
-Ng Thomas S., Tang Z., 2009, «Labour-intensive construction sub-contractors : Their critical success factors», International Journal of Project Management 28 (2010), 732–740.
-Nunnally J.C. et Bernstein I.H., 1994, «Psychometric theory 3rd ed., journal of psycho-educational assessment», 1999, 17, 275-280. Document disponible en ligne: http//psychology.concordia.ca/fac/kline/library/k99.pdf.
-Pmbok®(1996).A guide to the project management body of knowledge. -Project Management Institute, Newtown Square, PA 19073-3299.USA.
-Pmbok®(2000).A guide to the project management body of knowledge. Newtown Square, PA: Project Management Institute.
-Pmbok®(2008).AGuide to the Project Management Body of Knowledge. Fourth ed. Project management institute, Pennsylvania.
-Pmbok® (2013).A guide to the Project Management Body Of Knowledge. 5ème edition.
-Slevin D.P. & Pinto J.K.(1987).Critical factors in successful project implementation. IEEE Transactions on Engineering Management, Vol.34 (1), p.22-27.
-Slevin, D.P., Pinto J.K. & English, B.(2009).Trust in projects: An empirical assessment of owner/contractor relationships. International Journal of Project Management 27 (2009), 638–648.
-Takey, SM., Carvalho, M.M.(2015). Competency mapping in project management: An action research study in an engineering company. International Journal of Project Management 33 (2015) 784–796.
-Udo, N. & Koppensteiner, S. (2004). What are the core competencies of a successful project manager? Paper presented at PMI® Global Congress 2004—EMEA, Prague, Czech Republic. Newtown Square, PA: Project Management Institute.